Mission
About Neoen in Australia
Since 2012, Australia has been a key territory for Neoen. We have developed and built more than 4.5 GW of wind, solar and storage projects and targeting more than 5GW capacity in operation or under construction by early 2026 and an additional 5GW by 2030.Our development efforts in Australia started paying-off in late 2014, when the government of the ACT granted Neoen the major part of the capacity at stake in its tender process: it enabled us to deliver the wind power project of Hornsdale, which gradually increased to a capacity of 309 MW.
Neoen has delivered 20+ assets under construction, commissioning, and operation in most states/territories:
- SA: the 3 Hornsdale wind warms (Siemens technology), the 150MW/194MWh Hornsdale Power Reserve (Tesla technology) and the 200MW/400MWh Blyth Battery (NHOA technology); operational but still under the last stage of construction: the 209MW Goyder South 1A Wind Farm (38x5.5MW Cypress 5.5-158 Turbines) and the 204MW Goyder South 1B Wind Farm (37x5.5MW Cypress 5.5-158 Turbines) which combine is the largest wind farm operated by Neoen worldwilde.
- WA: the 219MW/877MWh and 341MW/1,363MWh Collie 1 and Collie 2 Batteries and as its first project decommissioned the Degrussa Solar Project (off-grid hybrid plant supplying electricity to the Sandfire copper mine in Meekatharra). Muchea BESS (164MW / 905 MWh) has started construction in Q2 25.
- NSW/ACT: in operation: five solar farms (the 188MWp Coleambally Solar Farm and the 4 “ARENA solar farms” located in Parkes, Griffith and Dubbo totaling 130MWp) and the Capital BESS (118MW / 200MWh, Doosan technology) and, currently under construction the 440MWp Culcairn Solar Farm.
- VIC: a solar farm, the Bulgana wind farm (Gamesa technology) and the Victorian Big Battery (300MW/450MWh, Tesla technology) – all assets have been divested to HMC as a requirement by ACCC to allow the acquisition of Neoen by Brookfield in 2024.
- QLD: in operation: the Western Downs Solar farm, Australia’s largest solar PV facility (460MWp), the 156 MW Kaban wind farm (Vestas technology), the 2 x 200MW/400MWh Western Downs Batteries (Tesla technology).
Neoen has offices located in Sydney and Canberra (main offices) as well as in Brisbane, Melbourne, Adelaide and Perth.
Role Description
Our Asset Management Department is looking for an Asset Manager who will manage all Operation and Maintenance dimensions of a group of operating assets, in line with Neoen’s strategic direction and in view of maintaining the highest value of the assets thanks to the maximization of their generated revenue and maintaining their operation capability over time.
Consequently, the Asset Manager needs to oversee globally all the aspects relevant to the assets performance, both from their technical and financial perspective. The main responsibilities will be the following :
- Follow registration aspects, O&M preparation, early-generation monitoring as well as manage the energy and certificates sales through/to the relevant entities (AEMO, CER, Off takers, etc.) during the construction phase;
- Provide assistance to the Development team for setting-up O&M solutions, discuss with potential Contractors/other parties or negotiating O&M agreements before Financial close of future projects;
- Coordinate and liaise as required with local communities to ensure the continuity of the relations established throughout the assets development and construction period;
- Supervise a few different asset locations (frequent travels will be required);
- Supervise staff, O&M contractors and external consultants involved in preparation and execution of the Operation and Maintenance activities;
- Prepare the budget forecasts for the O&M and update them on a monthly basis based upon actuals provided by Neoen’s finance department;
- Prepare O&M reporting for Internal and external stakeholders in accordance with relevant agreements;
- Ensure Workplace Health & Safety and Environmental objectives are achieved;
- Ensure operations and maintenance performance targets are achieved;
- Ensure maintenance outcomes are achieved while fostering a planned maintenance culture.
Profile
- Relevant Tertiary qualifications in the Engineering field
- Additional Business/Project management qualification would be a plus
- Proven skills and experience in the supervision and co-ordination of operation and maintenance activities associated with renewable energy generation or similar operation
- Working knowledge and understanding of renewable energy plants and equipment such as solar or wind plants and associated electrical equipment, auxiliary plant and high voltage infrastructure
- High level troubleshooting and problem solving skills and the ability to be technically innovative
- Contract management experience
- Demonstrated up-to-date working knowledge of Workplace Health, Safety & Environment requirements
- Excellent communication and liaison skills with the proven ability to effectively interact with a wide range of internal and external stakeholders
- Effective leadership and supervision skills
- Effective planning and organizational skills
- Well-developed computer skills and proficiency in MS Office and Computerized Maintenance Management Systems (CMMS)
- Autonomy
Skills
About Neoen
Founded in 2008, and owned since April 2025 by Brookfield, Neoen is one of the world’s leading independent producers of exclusively renewable energy, with expertise in power generation – solar and onshore wind power – and storage. Neoen plays an active role in accelerating the energy transition of the countries where it operates by delivering clean, competitively-priced local energy. Neoen is a high-growth company: its capacity in operation or under construction has quadrupled over the last six years and now stands at 8.5 GW. We are aiming to deliver an additional 10 GW by 2030. Neoen operates near close to 200 assets across three continents. Its flagships include Western Downs Green Power Hub in Australia, comprised of the largest solar farm in the country (460 MWp) and Western Downs Battery (212 MW / 424 MWh); Collie Battery (219 MW / 877 MWh) one of the world’s most powerful large-scale storage systems; France’s most powerful solar farm (300 MWp) in Cestas; and Finland’s largest wind farm (404 MW) in Mutkalampi. For more information: www.neoen.com
We value diversity
Our complex projects benefit greatly from the input of people with a wide range of backgrounds, views, and skills. We welcome applications from anyone who shares our values and feels they could help us accelerate the energy transition.